Energy assessment tool
Start with your current energy cost.
Eight questions produce a preliminary project profile: the facility, its energy environment, the evaluation RESOLV would recommend and the next step. It takes two minutes and it promises nothing it cannot measure.
Fields are used for evaluation only. No savings figure is estimated before your load data is measured.
This profile is an engineering starting point. Capacity, yield and cost are established after measurement, never before it.
How the evaluation is built
Deterministic, not decorative.
The assessment produces a direction. The numbers follow measurement: interval load data, a site survey, and a modelled yield with every assumption visible to a reviewer.
FAQs
About the assessment.
Because a savings figure produced before measuring your load is a guess with a decimal point. Anything credible follows interval metering, a site survey and a modelled yield with its assumptions written down.