Solar / On-Grid
On-Grid Solar
Daytime generation that reduces metered consumption without changing how the facility runs.
The problem
A facility buys every unit of electricity it consumes, including the units it could have generated on its own roof at midday. The avoided cost is real, but it is only realised if the generation window matches the load window.
When this solution applies
How it works
Four steps, no handover gaps.
RESOLV methodology
How the work is run.
Equipment and technology
Specified against the design.
Documented projects
Where this has been delivered.
Only engagements that exist in RESOLV's documented project record appear here.
| Client | Location | Capacity | Year | Case study |
|---|---|---|---|---|
| LCI Animal Health & Sciences | Sheikhupura | 286.56 kWp | 2026 | View project |
| Descon Oxychem Limited | Lahore / Sheikhupura | 2.016 MWp | 2026 | View project |
| LCI Animal Health & Sciences | Sheikhupura | 296.78 kWp | 2025 | View project |
| LCI Polyester | Sheikhupura | 994.00 kWp | 2025 | View project |
| Descon Engineering Ltd | Lahore | 74.88 kWp | 2025 | View project |
| Lucky Core Industries | Lahore | 64.86 kWp | 2024 | View project |
| LCI Polyester | Sheikhupura | 1,000.50 kWp | 2024 | View project |
| Descon Engineering Ltd | Kashmore / Guddu Barrage | 88.92 kWp | 2024 | View project |
| Honda Showroom | Jhelum | 47.97 kWp | 2024 | View project |
| Descon Oxychem Limited | Lahore / Sheikhupura | 283.620 kWp | 2024 | View project |
| Noon Sugar Mills | Bhalwal, Sargodha | 230 kWp | 2024 | View project |
| Al-Noor Sugar Mills | Moro, Sindh | 185.76 kWp | 2023 | View project |
| Frontier Force | Abbottabad | 152.50 kWp | 2022 | View project |
| Naveena Developers (Pvt) Ltd | Lahore | 13.20 kWp | 2022 | View project |
| Al-Noor Sugar Mills | Moro, Sindh | 59.40 kWp | 2021 | View project |
| LCI Polyester | Sheikhupura | 1,003.89 kWp | 2021 | View project |
| Al-Noor Sugar Mills | Karachi | 77.76 kWp | 2021 | View project |
| SHELL Retail Pakistan | Lahore | 61.02 kWp | 2021 | View project |
| Firhaj Footwear | Lahore | 466.65 kWp | 2020 | View project |
| Umer Farms (Pvt) Ltd | Sheikhupura | 194.40 kWp | 2020 | View project |
| Descon Engineering Ltd | Lahore | 59.25 kWp | 2019 | View project |
| Umer Farms (Pvt) Ltd | Sheikhupura | 758.40 kWp | 2019 | View project |
| Tata Pakistan | Karachi | 29 kWp | 2019 | View project |
Related reading
Engineering notes behind this solution.

The load profile is the project
Why an average consumption figure is the most expensive assumption in industrial energy planning.
Read the article
What should an industrial solar feasibility study actually tell you?
A feasibility study is not a quotation with a chart on top. It is the document that decides whether capital should move at all, and on what terms.
Read the article
BESS for industry: where storage actually fits into the energy system
Battery storage is not a bigger battery for the same job. It answers four specific problems, and only one of them is about generation.
Read the articleRelated services
Architectures that sit next to this one.
Relevant industries: Manufacturing, Chemical, Textiles, Food Processing, Agriculture, Commercial
FAQs
On-Grid Solar: what clients ask.
That depends entirely on the shape of the load. A daytime-heavy plant can offset a large share; a night-heavy plant much less, and in that case storage is the conversation. The figure is established from your measured profile, not from an industry average.
Next step
Request an energy assessment
Five questions, reviewed by an engineer before anyone contacts you.