Energy engineering

Project explorer / Frontier Force

On-Grid / 2022

Frontier Force

An on-grid installation at the Frontier Force Officer's Mess in Abbottabad, in a region where supply quality is a design consideration. Documented equipment: TRINA modules with HUAWEI inverters.

Planning something similar?Send a project brief
Frontier Force Officer's Mess, Abbottabad
Frontier Force Officer's Mess104.5 kWp / 2022
On-GridFrontier Force104.5 kWp / Abbottabad / 2022
Project scale104.5 kWp
ConnectionDocumented
LocationAbbottabad
Commissioned2022
SystemOn-Grid
IndustryInfrastructure

Documented record

As published in RESOLV's project record.

Transcribed from the project highlights table. Nothing on this page is inferred, and no figure is rounded to look better.

Description104.5 kWp On-Grid System
CustomerFrontier Force
CityAbbottabad
RegionKhyber Pakhtunkhwa
StatusCompleted
Year2022
IndustryInfrastructure
EquipmentTRINA + HUAWEI

Frontier Force is listed on this site as documented project experience. It is not an endorsement, and no performance claim is made on the client's behalf.

The photograph on this page is the one RESOLV publishes for this site: Frontier Force Officer's Mess. Where no labelled photograph exists, this site shows no image at all rather than a photograph of a different installation.

Delivery lifecycleFeasibility to O&M
RESOLV project lifecycle from feasibility to operations and maintenanceFEASIBILITY01MODELLING02ENGINEERING03PROCUREMENT04CONSTRUCTION05COMMISSIONING06O&M07
EquipmentTRINA + HUAWEI
ConnectionDocumented in profile
RegionKhyber Pakhtunkhwa
IndustryInfrastructure

Continue exploring

Projects that sit alongside this one.

A recently viewed project, a related industry project and projects of a similar capacity.

Descon Engineering - Guddu Barrage Project, Kashmore / Guddu Barrage
Micro-Grid / 2024

Descon Engineering Ltd

Photograph: Descon Engineering - Guddu Barrage Project
88.92 kWp Kashmore / Guddu Barrage
View project → 01
Descon Engineering - Head Office Phase 2, Lahore
On-Grid / 2025 / Phase 2

Descon Engineering Ltd

Photograph: Descon Engineering - Head Office Phase 2
74.88 kWp Lahore
View project → 02
LCI Pakistan Limited - Corporate Office, Lahore
On-Grid / 2024

LCI Pakistan Limited

Photograph: LCI Pakistan Limited - Corporate Office
64.86 kWp Lahore
View project → 03

Planning something similar?

Send the site detail and let an engineer review it.

The brief takes five questions. Nothing is quoted until the load and the site constraints are understood.

01 Need02 Facility03 Location04 Scale05 Contact
Step 1 / What do you need?
WhatsApp about this projectBack to the explorer
WhatsApp RESOLVDiscuss a projectProject brief
Request assessment →Chat