Energy engineering

Asset Performance / O&M

Operations & Maintenance

Plant reviews, monitoring and intervention across the operating life of an asset.

Request a plant review →
DisciplineAssessment to maintenance
Documented projects26
Documented capacity8.72 MWp
Registered forPunjab, Sindh, KPK, Islamabad

The problem

A solar plant is a twenty-five year asset with a two-year warranty period and a five-year attention span. Underperformance is usually a combination of the ordinary and the ignored: soiling, new shading, a string down, an inverter derating, monitoring that stopped reporting.

When this solution applies

System architectureO&M
RESOLV project lifecycle from feasibility to operations and maintenanceFEASIBILITY01MODELLING02ENGINEERING03PROCUREMENT04CONSTRUCTION05COMMISSIONING06O&M07

How it works

Four steps, no handover gaps.

01Establish the baselineModelled expectation against actual generation over the review period, with the gap attributed.
02Physical inspectionSoiling, shading, hotspots, string configuration, connectors and water ingress.
03Prioritised interventionsEach with the expected recovery, so spending can be sequenced against return.
04Monitoring and reviewPerformance reporting, exceptions flagged, and scheduled reviews across the year.

Scope of works

Operations & Maintenance: what the engagement covers.

The full published scope, transcribed from RESOLV's own service document so that a procurement team can see exactly what is included.

PV array and support frames10 checks
Water supply system3 checks
Water drain system3 checks
Earth pits8 checks
Inverter room16 checks
Transformer room2 checks
Weather station3 checks
Lightning protection system1 checks
Site lighting3 checks
Reporting and online monitoring5 checks

RESOLV methodology

How the work is run.

Equipment and technology

Specified against the design.

Documented projects

Where this has been delivered.

Only engagements that exist in RESOLV's documented project record appear here.

Project explorer →

This architecture is delivered through consultancy and advisory engagements.

The documented record covers 26 installations totalling 8.72 MWp across 2019 to 2026: on-grid, off-grid and a consultancy engagement. This particular architecture is delivered through consultancy and advisory work, which is released on request rather than listed project by project.

Request the engagement record

FAQs

Operations & Maintenance: what clients ask.

Yes. Reviews start from measurement of what the asset should produce against what it produces, which works on any plant regardless of who installed it.

Next step

Request a plant review

Five questions, reviewed by an engineer before anyone contacts you.

01 Need02 Facility03 Location04 Scale05 Contact
Step 1 / What do you need?
WhatsApp about Operations & Maintenance
WhatsApp RESOLVDiscuss a projectProject brief
Request assessment →Chat