Energy engineering

Solar / On-Grid

Commercial Solar

Rooftop generation for commercial property, retail groups and institutional campuses.

Assess your building →
DisciplineAssessment to maintenance
Documented engagements28
Installed by RESOLV8.48 MWp
Designed & supervised4.75 MWp
Registered forPunjab, Sindh, KPK, Islamabad

The problem

Commercial buildings consume in daylight and pay commercial tariffs for the privilege. Roof space is contested, tenancy arrangements complicate who benefits, and the building has to keep operating throughout.

When this solution applies

System architectureOn-Grid
Energy flow diagram: sun to array to inverter to facility, with grid interconnectionSUNPV ARRAYDCINVERTERACFACILITYLOADGRIDBIDIRECTIONAL METERING AT THE INTERCONNECTION POINT

How it works

Four steps, no handover gaps.

01Portfolio surveyEach site is assessed for roof condition, load, metering arrangement and access.
02Standardised designOne design language, adapted to each roof, so maintenance and spares stay simple across the portfolio.
03Staged rolloutSites are sequenced against tariff exposure and capital availability.
04Monitoring across sitesOne view of generation across the portfolio, with exceptions flagged.

RESOLV methodology

How the work is run.

Equipment and technology

Specified against the design.

Documented projects

Where this has been delivered.

Only engagements that exist in RESOLV's documented project record appear here.

Project explorer →
ClientLocationCapacityYearCase study
LCI Pakistan LimitedSheikhupura286.56 kWp2026View project
Descon Oxychem LimitedLahore / Sheikhupura2.016 MWp2026View project
LCI Pakistan LimitedSheikhupura296.78 kWp2025View project
LCI Pakistan LimitedSheikhupurac. 1,000 kWp2025View project
Descon Engineering LtdLahore74.88 kWp2025View project
LCI Pakistan LimitedLahore64.86 kWp2024View project
LCI Pakistan LimitedSheikhupurac. 1,001 kWp2024View project
Honda ShowroomJhelum47.97 kWp2024View project
Descon Oxychem LimitedLahore / Sheikhupura283.620 kWp2024View project
Noon Sugar Mills LimitedBhalwal, Sargodha230 kWp2024View project
Al Noor MDFMoro, Sindhc. 57 kWp2023View project
Al-Noor Sugar MillsMoro, Sindh185.76 kWp2023View project
Frontier ForceAbbottabad104.5 kWp2022View project
Naveena Developers (Pvt) LtdLahore13.20 kWp2022View project
LCI Pakistan LimitedSheikhupura1,004 kWp2022View project
Al-Noor Sugar MillsMoro, Sindh59.40 kWp2021View project
Al-Noor Sugar MillsKarachi77.76 kWp2020View project
Shell PakistanLahore61.02 kWp2021View project
Firhaj FootwearLahore466.65 kWp2020View project
Umer Farms (Pvt) LtdSheikhupura194.40 kWp2020View project
Descon Engineering LtdLahorec. 60 kWp2019View project
Umer Farms (Pvt) LtdSheikhupura758.40 kWp2019View project
Tata PakistanKarachic. 29 kWp2019View project

FAQs

Commercial Solar: what clients ask.

Yes, but the arrangement has to be designed: metering, tariff pass-through and maintenance responsibility all have to be settled before construction rather than after.

Next step

Assess your building

Five questions, reviewed by an engineer before anyone contacts you.

01 Need02 Facility03 Location04 Scale05 Contact
Step 1 / What do you need?
WhatsApp about Commercial Solar
WhatsApp RESOLVDiscuss a projectProject brief
Request assessment →Chat