Energy engineering

Energy Storage / Storage

BESS

Battery storage for peak control, outage resilience and moving solar into the hours that need it.

Discuss energy storage →
DisciplineAssessment to maintenance
Documented projects26
Documented capacity8.72 MWp
Registered forPunjab, Sindh, KPK, Islamabad

The problem

Generation and consumption rarely happen at the same time. A plant may generate at midday and run its heaviest load at night, pay a maximum demand charge for a peak it could shave, or lose critical load to an outage a generator takes seconds to cover.

When this solution applies

System architectureStorage
Hybrid architecture: solar, grid, generator and battery feeding the facility through one control pointPVGRIDGENERATORBESSENERGY MANAGEMENT CONTROLFACILITYPRIORITY LOAD BANKSOURCE PRIORITY SET PER LOAD GROUP, NOT PER SITE

How it works

Four steps, no handover gaps.

01Define the duty cycleThe battery is sized against one job: shifting, peak shaving, bridging or generator reduction.
02Power and energy sizingPower rating and energy capacity are sized separately, because they are rarely the same number.
03Controls and protectionCharge and discharge logic, source priority per load group, and protection coordination with the existing board.
04Thermal and safety designLocation, ventilation, fire strategy and monitoring of state of health.

RESOLV methodology

How the work is run.

Equipment and technology

Specified against the design.

Documented projects

Where this has been delivered.

Only engagements that exist in RESOLV's documented project record appear here.

Project explorer →

This architecture is delivered through consultancy and advisory engagements.

The documented record covers 26 installations totalling 8.72 MWp across 2019 to 2026: on-grid, off-grid and a consultancy engagement. This particular architecture is delivered through consultancy and advisory work, which is released on request rather than listed project by project.

Request the engagement record

FAQs

BESS: what clients ask.

Yes, wherever there is a demand charge, an outage cost or diesel running for load. Storage is often the smallest capital item with the most immediate financial argument.

Next step

Discuss energy storage

Five questions, reviewed by an engineer before anyone contacts you.

01 Need02 Facility03 Location04 Scale05 Contact
Step 1 / What do you need?
WhatsApp about BESS
WhatsApp RESOLVDiscuss a projectProject brief
Request assessment →Chat