Energy Storage / Storage
BESS
Battery storage for peak control, outage resilience and moving solar into the hours that need it.
The problem
Generation and consumption rarely happen at the same time. A plant may generate at midday and run its heaviest load at night, pay a maximum demand charge for a peak it could shave, or lose critical load to an outage a generator takes seconds to cover.
When this solution applies
How it works
Four steps, no handover gaps.
RESOLV methodology
How the work is run.
Equipment and technology
Specified against the design.
Documented projects
Where this has been delivered.
Only engagements that exist in RESOLV's documented project record appear here.
This architecture is delivered through consultancy and advisory engagements.
The documented record covers 26 installations totalling 8.72 MWp across 2019 to 2026: on-grid, off-grid and a consultancy engagement. This particular architecture is delivered through consultancy and advisory work, which is released on request rather than listed project by project.
Request the engagement recordRelated reading
Engineering notes behind this solution.

BESS for industry: where storage actually fits into the energy system
Battery storage is not a bigger battery for the same job. It answers four specific problems, and only one of them is about generation.
Read the article
The load profile is the project
Why an average consumption figure is the most expensive assumption in industrial energy planning.
Read the article
What should an industrial solar feasibility study actually tell you?
A feasibility study is not a quotation with a chart on top. It is the document that decides whether capital should move at all, and on what terms.
Read the articleRelated services
Architectures that sit next to this one.
Relevant industries: Manufacturing, Textiles, Food Processing, Agriculture, Retail, Residential
FAQs
BESS: what clients ask.
Yes, wherever there is a demand charge, an outage cost or diesel running for load. Storage is often the smallest capital item with the most immediate financial argument.
Next step
Discuss energy storage
Five questions, reviewed by an engineer before anyone contacts you.