Energy engineering

Specialised / Off-Grid

Off-Grid

Independent supply for sites where no dependable utility connection exists.

Assess your site →
DisciplineAssessment to maintenance
Documented engagements28
Installed by RESOLV8.48 MWp
Designed & supervised4.75 MWp
Registered forPunjab, Sindh, KPK, Islamabad

The problem

A site with no reliable feeder has to generate everything it consumes, hold enough energy for the gaps, and keep a backup for the residual case. There is no fallback to lean on, so the architecture has to be complete.

When this solution applies

System architectureOff-Grid
Micro-grid architecture: solar, battery and generator through a controller to the loadSOLARBATTERYGENERATORMICRO-GRID CONTROLLERLOADSITE DISTRIBUTIONDESIGNED FOR UNATTENDED OPERATION

How it works

Four steps, no handover gaps.

01Duty cycle and worst weekThe system is sized for the worst condition the site will face, not the annual average.
02Generation and storageSolar sized against the worst irradiance window, storage sized for the longest expected gap.
03Residual backupGeneration kept for the edge case, and used as little as the architecture allows.
04Unattended operationRemote monitoring, fault isolation and accessibility designed for a site with no permanent electrical team.

RESOLV methodology

How the work is run.

Equipment and technology

Specified against the design.

Documented projects

Where this has been delivered.

Only engagements that exist in RESOLV's documented project record appear here.

Project explorer →

This architecture is delivered through consultancy and advisory engagements.

The documented record covers 28 engagements: 8.48 MWp installed by RESOLV and 4.75 MWp designed, supervised or maintained across 2019 to 2026, covering on-grid, off-grid, micro-grid and consultancy work.

Request the engagement record

FAQs

Off-Grid: what clients ask.

Sometimes, but rarely at the lowest cost of risk. Most off-grid designs keep a generator for the residual case and reduce its running hours through generation and storage.

Next step

Assess your site

Five questions, reviewed by an engineer before anyone contacts you.

01 Need02 Facility03 Location04 Scale05 Contact
Step 1 / What do you need?
WhatsApp about Off-Grid
WhatsApp RESOLVDiscuss a projectProject brief
Request assessment →Chat