Specialised / Off-Grid
Off-Grid
Independent supply for sites where no dependable utility connection exists.
The problem
A site with no reliable feeder has to generate everything it consumes, hold enough energy for the gaps, and keep a backup for the residual case. There is no fallback to lean on, so the architecture has to be complete.
When this solution applies
How it works
Four steps, no handover gaps.
RESOLV methodology
How the work is run.
Equipment and technology
Specified against the design.
Documented projects
Where this has been delivered.
Only engagements that exist in RESOLV's documented project record appear here.
This architecture is delivered through consultancy and advisory engagements.
The documented record covers 26 installations totalling 8.72 MWp across 2019 to 2026: on-grid, off-grid and a consultancy engagement. This particular architecture is delivered through consultancy and advisory work, which is released on request rather than listed project by project.
Request the engagement recordRelated reading
Engineering notes behind this solution.

When the grid is the constraint: designing micro-grids for remote sites
Remote sites fail energy planning for a different reason than city sites. There is no fallback, so the architecture has to be complete.
Read the article
What should an industrial solar feasibility study actually tell you?
A feasibility study is not a quotation with a chart on top. It is the document that decides whether capital should move at all, and on what terms.
Read the article
BESS for industry: where storage actually fits into the energy system
Battery storage is not a bigger battery for the same job. It answers four specific problems, and only one of them is about generation.
Read the articleRelated services
Architectures that sit next to this one.
Relevant industries: Agriculture, Infrastructure
FAQs
Off-Grid: what clients ask.
Sometimes, but rarely at the lowest cost of risk. Most off-grid designs keep a generator for the residual case and reduce its running hours through generation and storage.
Next step
Assess your site
Five questions, reviewed by an engineer before anyone contacts you.