Energy engineering

Project explorer / Firhaj Footwear

On-Grid / 2020

Firhaj Footwear

A 466.65 kWp installation for Firhaj Footwear, sized against a multi-shift manufacturing load.

Planning something similar?Send a project brief

Text and records only for this engagement.

RESOLV has not published a photograph of this site, so this page presents the documented record without imagery. No photograph of a different installation is used to fill the space.

Project scale466.65 kWp
ConnectionDocumented
LocationLahore
Commissioned2020
SystemOn-Grid
IndustryTextiles

Documented record

As published in RESOLV's project record.

Transcribed from the project highlights table. Nothing on this page is inferred, and no figure is rounded to look better.

Description466.65 kWp On-Grid System
CustomerFirhaj Footwear
CityLahore
RegionPunjab
StatusCompleted
Year2020
IndustryTextiles
EquipmentSpecified from RESOLV's technology partners

Firhaj Footwear is listed on this site as documented project experience. It is not an endorsement, and no performance claim is made on the client's behalf.

RESOLV has not published a labelled photograph of this site, so this record is presented without imagery.

Delivery lifecycleFeasibility to O&M
RESOLV project lifecycle from feasibility to operations and maintenanceFEASIBILITY01MODELLING02ENGINEERING03PROCUREMENT04CONSTRUCTION05COMMISSIONING06O&M07
EquipmentSpecified from RESOLV's technology partners
ConnectionDocumented in profile
RegionPunjab
IndustryTextiles

Continue exploring

Projects that sit alongside this one.

A recently viewed project, a related industry project and projects of a similar capacity.

Planning something similar?

Send the site detail and let an engineer review it.

The brief takes five questions. Nothing is quoted until the load and the site constraints are understood.

01 Need02 Facility03 Location04 Scale05 Contact
Step 1 / What do you need?
WhatsApp about this projectBack to the explorer
WhatsApp RESOLVDiscuss a projectProject brief
Request assessment →Chat