Energy engineering

Project explorer / Descon Engineering Ltd

Micro-Grid / 2024

Descon Engineering Ltd

An 88.92 kWp installation at the Guddu Barrage project, supplied as a micro-grid: the system operates with generator sets because there is no grid at site. Documented equipment: JINKO modules with HUAWEI inverters.

Planning something similar?Send a project brief
Descon Engineering - Guddu Barrage Project, Kashmore / Guddu Barrage
Descon Engineering - Guddu Barrage Project88.92 kWp / 2024
Micro-GridDescon Engineering Ltd88.92 kWp / Kashmore / Guddu Barrage / 2024
Project scale88.92 kWp
ConnectionMicro-grid, no grid at site
LocationKashmore / Guddu Barrage
Commissioned2024
SystemMicro-Grid
IndustryInfrastructure

Documented record

As published in RESOLV's project record.

Transcribed from the project highlights table. Nothing on this page is inferred, and no figure is rounded to look better.

Description88.92 kWp Micro-Grid System
CustomerDescon Engineering Ltd
CityKashmore / Guddu Barrage
RegionSindh
StatusCompleted
Year2024
IndustryInfrastructure
EquipmentJINKO + HUAWEI

Descon Engineering Ltd is listed on this site as documented project experience. It is not an endorsement, and no performance claim is made on the client's behalf.

The photograph on this page is the one RESOLV publishes for this site: Descon Engineering - Guddu Barrage Project. Where no labelled photograph exists, this site shows no image at all rather than a photograph of a different installation.

Delivery lifecycleFeasibility to O&M
RESOLV project lifecycle from feasibility to operations and maintenanceFEASIBILITY01MODELLING02ENGINEERING03PROCUREMENT04CONSTRUCTION05COMMISSIONING06O&M07
EquipmentJINKO + HUAWEI
ConnectionMicro-grid, no grid at site
RegionSindh
IndustryInfrastructure

Continue exploring

Projects that sit alongside this one.

A recently viewed project, a related industry project and projects of a similar capacity.

Descon Engineering - Head Office Phase 2, Lahore
On-Grid / 2025 / Phase 2

Descon Engineering Ltd

Photograph: Descon Engineering - Head Office Phase 2
74.88 kWp Lahore
View project → 01
Frontier Force Officer's Mess, Abbottabad
On-Grid / 2022

Frontier Force

Photograph: Frontier Force Officer's Mess
104.5 kWp Abbottabad
View project → 02
Descon Engineering - Head Office Phase 1, Lahore
On-Grid / 2019 / Phase 1

Descon Engineering Ltd

Photograph: Descon Engineering - Head Office Phase 1
c. 60 kWp Lahore
View project → 03

Planning something similar?

Send the site detail and let an engineer review it.

The brief takes five questions. Nothing is quoted until the load and the site constraints are understood.

01 Need02 Facility03 Location04 Scale05 Contact
Step 1 / What do you need?
WhatsApp about this projectBack to the explorer
WhatsApp RESOLVDiscuss a projectProject brief
Request assessment →Chat