Energy engineering

Project explorer / Nuricon Petroservices (Pte.) Ltd

Off-Grid / 2019

Nuricon Petroservices (Pte.) Ltd

A 15 kWp off-grid installation for a remote location in interior Sindh, the earliest off-grid entry in the record. Listed in RESOLV's project highlights table.

Planning something similar?Send a project brief

Text and records only for this engagement.

RESOLV has not published a photograph of this site, so this page presents the documented record without imagery. No photograph of a different installation is used to fill the space.

Project scale15 kWp
ConnectionDocumented
LocationInterior Sindh
Commissioned2019
SystemOff-Grid
IndustryInfrastructure

Documented record

As published in RESOLV's project record.

Transcribed from the project highlights table. Nothing on this page is inferred, and no figure is rounded to look better.

Description15 kWp Off-Grid System
CustomerNuricon Petroservices (Pte.) Ltd
CityInterior Sindh
RegionSindh
StatusCompleted
Year2019
IndustryInfrastructure
EquipmentDocumented in RESOLV's project profile

Nuricon Petroservices (Pte.) Ltd is listed on this site as documented project experience. It is not an endorsement, and no performance claim is made on the client's behalf.

RESOLV has not published a labelled photograph of this site, so this record is presented without imagery.

Delivery lifecycleFeasibility to O&M
RESOLV project lifecycle from feasibility to operations and maintenanceFEASIBILITY01MODELLING02ENGINEERING03PROCUREMENT04CONSTRUCTION05COMMISSIONING06O&M07
EquipmentDocumented in RESOLV's project profile
ConnectionDocumented in profile
RegionSindh
IndustryInfrastructure

Continue exploring

Projects that sit alongside this one.

A recently viewed project, a related industry project and projects of a similar capacity.

Descon Engineering - Guddu Barrage Project, Kashmore / Guddu Barrage
Micro-Grid / 2024

Descon Engineering Ltd

Photograph: Descon Engineering - Guddu Barrage Project
88.92 kWp Kashmore / Guddu Barrage
View project → 01
Frontier Force Officer's Mess, Abbottabad
On-Grid / 2022

Frontier Force

Photograph: Frontier Force Officer's Mess
104.5 kWp Abbottabad
View project → 02

Planning something similar?

Send the site detail and let an engineer review it.

The brief takes five questions. Nothing is quoted until the load and the site constraints are understood.

01 Need02 Facility03 Location04 Scale05 Contact
Step 1 / What do you need?
WhatsApp about this projectBack to the explorer
WhatsApp RESOLVDiscuss a projectProject brief
Request assessment →Chat